Position and level
Pan set level and aligned to the waste outlet centre for proper drainage

Mubarak Al-Kabeer
A western toilet installation in Sabah Al-Salem is rarely complete without a hand held bidet spray, the shattaf, beside the pan. We take its supply from the same isolating valve point as the cistern using a proper tee, so both work at steady pressure without dripping.
A shattaf left on a mains or tank feed with no stop valve can weep through its hose when the trigger is closed, and a burst hose can flood the room. In the family homes around Sabah Al-Salem Co-op we fit a tee with its own shutoff, mount the spray holder where it clears the seat, and choose a hose length that reaches without trailing on the floor. Everything is tested under full pressure before handover.
Sabah Al-Salem lies in Mubarak Al-Kabeer governorate, with the Sabah Al-Salem Co-op and the Messila Park area nearby.
Closing a shattaf's own stop valve when not in use takes constant pressure off its hose and trigger.
Pan set level and aligned to the waste outlet centre for proper drainage
Wax ring or rubber gasket fitted between pan base and the floor outlet flange
Braided flexible supply tail and a dedicated isolation valve fitted to the cistern
Cistern mounted and float valve adjusted for correct fill level and full flush
Sanitary silicone bead around the pan base stops water tracking under the tile
Multiple flush cycles run immediately after fitting to confirm all joints are dry
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
The hose stays under full pressure whenever the trigger is shut. A worn hose gives way over time, so we fit a rated hose and a stop valve that relieves it.
Usually on the side of the user's preferred hand and near the supply point. We agree the position with you before drilling.
