Washbasin and wall-hung basin
Countertop or wall-hung, with supply lines and a sealed waste trap.

Ahmadi
Sanitary fixture installation in Zour begins by understanding main lines from the power and water generation plant. We run steel and copper pipes to basins and toilets, connect waste to the subsurface network and test every joint.
Work buildings at Zour sit on damp ground near the sea, with waste pipes running through subsurface voids before reaching a central treatment plant. Twin basins and toilets in each office need enlarged pipes to handle rapid water flow. We inspect the foundation and concrete walls before installation and confirm pipes will not leak from soil moisture.
Zour sits in Ahmadi governorate near the power generation plant, where fixtures rely on safe drainage in damp surroundings.
Every waste pipe is filled and rapidly drained before handover to check for trapped air in subsurface voids.
Countertop or wall-hung, with supply lines and a sealed waste trap.
Wall or counter mount with correct waste outlet and supply valves.
Pan, cistern or in-wall frame, sealed base and flush line fitted correctly.
Tray, linear drain, riser and mixer connected and water-tested before tiling.
Set level, overflow solvent-welded, mixer and waste fully connected.
Supply, pump and jet lines connected with pressure test before finishing.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We wrap steel pipes in protective tape and apply corrosion inhibitor before laying in voids. Copper pipes need no extra protection because copper is naturally corrosion-resistant.
Trapped air blocks water flow and causes poor toilet flushing. We fill the pipe from the top and rapidly empty from the bottom to dislodge air bubbles from joints and bends.
