Draining and deep clean
Sediment, algae and corrosion residue removed before any prep begins

Mubarak Al-Kabeer
Epoxy tank lining in Masayel starts by draining the tank and scraping its inner walls of algae and old deposits. We sand the surface, apply epoxy to a set thickness and inspect it by camera before refilling.
Masayel houses typically have roof or ground-floor tanks where water travels through long pipes in sunlight before reaching storage. This means tank walls face chemical reaction between metals, oxygen and warm water, and algae grows quickly in hot months. Epoxy creates a complete barrier that stops rust and biological growth and keeps stored water clean longer.
Masayel lies in Mubarak Al-Kabeer governorate, a residential area where ground tanks are common because water pressure from mains is low.
Before coating, we test wall pH with a field meter because epoxy does not bond to surfaces with high alkalinity.
Sediment, algae and corrosion residue removed before any prep begins
Walls and floor abraded so the epoxy bonds without lifting or bubbling
Two-coat system builds uniform thickness across all internal surfaces
Fine cracks sealed with filler compound before coating, not over them
Internal camera confirms full coverage and detects any early delamination
Tank refilled only after the epoxy has fully cured, confirmed on site
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Two or three days depending on tank size. Day one is draining, cleaning and sanding; day two or three covers coating, drying and camera inspection.
No, epoxy needs a full seven days to cure before the tank is filled. In early days it may leave a faint smell, which disappears with ventilation.
