Draining and deep clean
Sediment, algae and corrosion residue removed before any prep begins

Hawalli
New houses in Mubarak Al-Abdullah often have their tanks lined before the first fill, and epoxy tank lining there depends on one factor above all: the concrete must be dry enough to accept it. We test moisture before priming and wait if the reading is still too high.
Freshly cast tank walls hold a lot of water, and epoxy laid over damp concrete can blister as that moisture tries to escape. We measure surface moisture with a meter and also tape a plastic sheet to the wall overnight to see whether condensation forms beneath it. Laitance, the weak powdery skin on new concrete, is ground off so the primer reaches solid material. Formwork tie holes are filled flush before coating so they cannot trap air bubbles.
Mubarak Al-Abdullah is a residential suburb in Hawalli governorate with many recently built houses and newly cast water tanks.
A taped plastic sheet test is left on new tank walls overnight to check for trapped moisture.
Sediment, algae and corrosion residue removed before any prep begins
Walls and floor abraded so the epoxy bonds without lifting or bubbling
Two-coat system builds uniform thickness across all internal surfaces
Fine cracks sealed with filler compound before coating, not over them
Internal camera confirms full coverage and detects any early delamination
Tank refilled only after the epoxy has fully cured, confirmed on site
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
New concrete needs time to release its water. Lining too soon risks blisters, so we test first and line as soon as it is ready.
That is laitance, a weak surface layer on fresh concrete. It is ground off before priming so the epoxy bonds to solid concrete.
