Draining and deep clean
Sediment, algae and corrosion residue removed before any prep begins

Capital
Epoxy tank lining in Qibla starts with complete drainage and scraping the old internal coat and any rust deposits. We prepare the surface with mild acid, dry the walls thoroughly, apply epoxy layers by brush and finish with an underwater camera inspection.
Commercial building tanks in Qibla near Seif Palace are often rooftop or upper-floor mounted, so water sits longer under intense sun. This causes rapid oxidation of concrete walls and seepage through fine cracks. An epoxy coat forms a tight seal that prevents water and oxygen from reacting with the concrete.
Qibla sits along the coastal Gulf Road in the capital, where commercial buildings and hotels rely on large rooftop tanks.
We inspect the dried coat with a camera because hairline cracks are invisible to the naked eye.
Sediment, algae and corrosion residue removed before any prep begins
Walls and floor abraded so the epoxy bonds without lifting or bubbling
Two-coat system builds uniform thickness across all internal surfaces
Fine cracks sealed with filler compound before coating, not over them
Internal camera confirms full coverage and detects any early delamination
Tank refilled only after the epoxy has fully cured, confirmed on site
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Drainage and surface prep takes one full day, applying epoxy layers needs two days with drying time between coats. Camera inspection and refilling happens on day four.
We use only approved epoxy rated for potable tanks, which transfers no taste or odour to water. After full curing we run pumps to flush lines before handover.
