Draining and deep clean
Sediment, algae and corrosion residue removed before any prep begins

Farwaniya
Epoxy tank lining in Rehab begins with complete tank drainage and inspecting the internal walls for damage. We remove sediment and rust with mechanical tools, then apply rated epoxy coats and run a water hold test before handover.
Rehab family homes rely on large underground tanks beneath yards or rooftop tanks, both exposed to corrosion from saltwater and sun exposure. Interior walls crack and leak after years, and epoxy seals every hairline fracture and stops water loss without replacing the whole tank. We carefully open the tank lid and inspect the floor and corners before cleaning begins.
Rehab lies in Farwaniya governorate, a residential zone where individual family tanks need regular maintenance to stay watertight.
After epoxy cures completely, we fill the tank slowly and watch the walls for two hours to confirm no leaks appear.
Sediment, algae and corrosion residue removed before any prep begins
Walls and floor abraded so the epoxy bonds without lifting or bubbling
Two-coat system builds uniform thickness across all internal surfaces
Fine cracks sealed with filler compound before coating, not over them
Internal camera confirms full coverage and detects any early delamination
Tank refilled only after the epoxy has fully cured, confirmed on site
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Cleaning and surface prep take one day, epoxy application and curing take two more days. We test the tank on day four before refilling it.
Yes, the tank must be empty and inside walls completely dry before surface cleaning. We use a pump and air blower to ensure full dryness throughout.
