Draining and deep clean
Sediment, algae and corrosion residue removed before any prep begins

Mubarak Al-Kabeer
Epoxy tank lining in Sabhan Industrial begins with draining the tank and scrubbing the inner walls clear of sediment and rust entirely. We apply a primer coat, then the final epoxy layer, and finish with a detailed camera inspection to confirm no gaps or thin spots remain.
Sabhan Industrial warehouses hold large storage tanks subject to corrosion from hard water and mineral salts, especially tanks feeding industrial cleaning equipment or hydraulic systems. Bare metal walls allow algae and bacteria to grow under direct sun, degrading stored water quality. Epoxy lining creates a sealed barrier that stops metal reacting with water and cuts sediment buildup on the floor. Before any coat goes on, we strip the tank completely using wire brushes and mechanical scrapers to remove rust and old paint. After cleaning we wait for full dryness, then apply layers to industrial epoxy standards.
Sabhan Industrial lies in Mubarak Al-Kabeer governorate, an area of large warehouses and processing plants that rely on heavy-duty storage tanks.
We inspect the tank with a thermal camera after coating because small voids remain invisible to the naked eye.
Sediment, algae and corrosion residue removed before any prep begins
Walls and floor abraded so the epoxy bonds without lifting or bubbling
Two-coat system builds uniform thickness across all internal surfaces
Fine cracks sealed with filler compound before coating, not over them
Internal camera confirms full coverage and detects any early delamination
Tank refilled only after the epoxy has fully cured, confirmed on site
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Draining and cleaning take a full day, drying requires overnight, coating and inspection take another day. The schedule depends on tank size and severity of existing corrosion.
At least 48 hours must pass for the epoxy to cure fully before the tank is filled with water. We recommend filling slowly so the new coat settles safely under pressure.