Crack mapping by camera
Internal camera maps every crack and its depth before work begins

Jahra
Fibreglass tank repair in Amghara requires detailed inspection because many tanks here are fully exposed to sun and intense heat. The tank is completely drained and every hairline crack is sought, no matter how fine. Water is tested under controlled pressure to confirm each leak location before sealing and reinforcing with fresh fibreglass.
Amghara is near the industrial zone and has many commercial and residential buildings with roofs directly exposed to the sun. A tank fully exposed to intense heat loses fibreglass flexibility over years and becomes brittle and prone to cracking. We inspect the outer surface for fine cracks or old stains from long-term seepage. The tank floor is prone to sediment build-up and pressure, so we clean it first before detailed inspection.
Amghara is in Jahra governorate near the industrial zone, a mixed area of residential and commercial buildings.
The tank is filled gradually and held full for two complete hours before the final repair is accepted.
Internal camera maps every crack and its depth before work begins
Grinding the area around the crack ensures the resin bonds properly
Resin-saturated glass-mat layers fill the crack and restore structural stiffness
Delaminated sections are removed and rebuilt with matching laminate material
Full interior coat with epoxy rated safe for potable water contact
Camera confirms no remaining cracks or coating bubbles before the tank refills
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Epoxy needs specific temperature to set properly. We work in early morning or evening when heat is lower to ensure perfect curing.
Yes, insulation must be removed first to access the fibreglass and cracks easily. We reinstall the insulation after repair, testing and acceptance.
