Crack welding
direct thermal weld along each fracture line in the tank wall

Hawalli
Tank welding in Hawalli handles plastic and metal tanks on roofs of residential and commercial buildings. We climb to the roof and fully inspect the tank under natural and bright light. We locate the crack or hole and grade it by size and position. We prepare the surface by sanding and cleaning, then weld the damage with material suited to the tank itself. We test the seal with partial fill before confirming handover.
Most Hawalli tanks are yellow or orange plastic on mid and high-rise residential towers. Cracks appear from repeated internal pressure and thermal expansion. We also inspect rare metal tanks on older buildings near Hawalli Co-op. Top supply pipes can press the tank from the side. We carefully raise the pipes before welding the crack. We check concrete tank supports to confirm the position is stable.
Hawalli in Hawalli governorate contains Hawalli Co-op and the Kuwait Red Crescent Society, with water tanks on various roofs.
The tank is filled completely under sun for one hour and the welded crack is watched without extra measuring tools.
direct thermal weld along each fracture line in the tank wall
re-welding inlet and outlet fittings where the flange joint has failed
resin-and-mat layer over the damaged zone before the final weld seal
internal camera after welding reveals any weak point before refilling
replacing the tank lid when the leak source is the cover seal
written record of weld locations and camera inspection result
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, extra pressure from height demands deeper welding and thicker rod. We choose material by height and tank size. We test the weld under full pressure, not partial.
Welding small cracks in the upper part may proceed with some water at the bottom. But cracks near the base need complete draining. We pump water out through a temporary drain pipe at the tank bottom.
