Crack welding
direct thermal weld along each fracture line in the tank wall

Ahmadi
Welded tank repair in Jaber Al-Ali fixes broken joints in rooftop and ground plastic and fibreglass tanks. We diagnose leak location precisely and water pressure test before repair begins. We prepare the crack surface and apply pressure-rated resin welding. The tank is ready for use after final testing.
Most houses in Jaber Al-Ali have a metal or plastic rooftop tank above the garage or front yard. Metal tanks rust from moisture and plastic tanks develop cracks from ultraviolet rays and thermal expansion. Joints between the inlet, drain and overflow lines bear the full water pressure when the tank fills. We inspect for rust, remove weak layers and weld cracks with reliable sealing that handles high pressure and seasonal temperature swings.
Jaber Al-Ali is a suburb in Ahmadi governorate where villas with private gardens are spread throughout.
Cracks are sealed with epoxy resin that hardens in six hours because solvents need that time to fully evaporate.
direct thermal weld along each fracture line in the tank wall
re-welding inlet and outlet fittings where the flange joint has failed
resin-and-mat layer over the damaged zone before the final weld seal
internal camera after welding reveals any weak point before refilling
replacing the tank lid when the leak source is the cover seal
written record of weld locations and camera inspection result
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, metal tanks need rust scraped first then a protective metal coating applied. Plastic tanks use a different epoxy resin that does not react with plastic material.
We check the tank floor, side walls and all inlet, drain and overflow ports. We look for small cracks, rust and slow seepage from any connection point.
