Inspection and mapping
Internal camera maps every crack and spalled area before work starts

Ahmadi
Tank restoration in Jaber Al-Ali focuses on removing thick deposits of calcium and magnesium salt that build up in deep ground reservoirs. We remove scale using scraping and water pressure, then coat walls and floor with salt-resistant cement lining. Sealing is tested before system restart.
Deep ground reservoirs in Jaber Al-Ali sit far below grade, meaning water stagnates longer and salt concentration peaks. Tank walls become rough and a thick white sludge collects on the floor, choking water flow. We open the top access and extract sludge by hand before scraping, because pumping alone does not clean deep corners properly. Then we apply flexible lining that tolerates tank expansion from temperature swings.
Jaber Al-Ali in Ahmadi governorate is marked by deeply buried ground tanks because of high ground level.
We fully drain the ground tank before entry, because stagnant water produces gases that lower oxygen in the enclosed space.
Internal camera maps every crack and spalled area before work starts
All scale, efflorescence and loose material removed before any filler is applied
Hydraulic mortar seals active and dry cracks in concrete walls and floor
Repair render restores corroded or pitted wall surfaces to a uniform face
Drinking-water rated coating applied over fully cured and prepared surfaces only
Camera confirms coating integrity and joint sealing before the tank refills
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Usually one and a half to two full days depending on sludge thickness. We extract sludge by hand into buckets, then wash walls and floor with high-pressure water. Drying before lining needs extra hours in open air.
Rigid cement lining may crack from expansion, so we apply flexible epoxy lining that tolerates movement. We coat all inner surfaces in two coats and allow full cure before tank fill.
