Crack welding
direct thermal weld along each fracture line in the tank wall

Capital
Tank welding in Sharq is usually requested by a facility team that needs paperwork as much as the repair itself. For towers around Sharq Marina and the NBK Head Office, we supply a method statement before work and a photo record of the crack, weld and refill test afterwards.
Building managers in Sharq work under permit systems, so hot work on a roof or in a plant room needs approval in advance. Our method statement lists the tank, the isolation points, the drain route and the safety measures. During the job we photograph the crack before and after preparation, the finished weld, and the water level at the start and end of the standing test, then send the set as one report for the maintenance file.
Sharq is the capital's business district on the waterfront, home to Kuwait Towers, Sharq Marina and the NBK Head Office.
Every Sharq tank repair is documented with before and after photos and a standing test level record.
direct thermal weld along each fracture line in the tank wall
re-welding inlet and outlet fittings where the flange joint has failed
resin-and-mat layer over the damaged zone before the final weld seal
internal camera after welding reveals any weak point before refilling
replacing the tank lid when the leak source is the cover seal
written record of weld locations and camera inspection result
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes. We prepare a method statement covering isolation, draining, hot work safety and refilling, ready for your approval.
Photos of the crack, the preparation and the finished weld, plus the water level readings from the standing test.
