Crack welding
direct thermal weld along each fracture line in the tank wall

Ahmadi
Tank welding in Shuaiba focuses on large, heavily used tanks in industrial and residential zones. We inspect cracks by sight and test fill, dry with controlled heat, then weld and test under high pressure.
Shuaiba is an industrial and residential zone south of Ahmadi, its tanks serving oil refineries, heavy industry, workers and families. Daily-use tanks face constant pressure and rapid water level swings, creating mechanical stress on seams. Cracks often appear in multiple places at once because the tank is old or cheaply made. Before welding we shield adjacent areas with metal covers because heat can weaken surrounding material.
Shuaiba is a coastal industrial zone in Ahmadi governorate where factories, marine stations and worker housing concentrate.
Every tank is documented with photos before, during and after welding plus a signed pressure-test card.
direct thermal weld along each fracture line in the tank wall
re-welding inlet and outlet fittings where the flange joint has failed
resin-and-mat layer over the damaged zone before the final weld seal
internal camera after welding reveals any weak point before refilling
replacing the tank lid when the leak source is the cover seal
written record of weld locations and camera inspection result
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
A twenty-five-thousand-litre tank takes at least four hours: drain, internal clean, slow fill with weld watch, then pressure test. Larger tanks may need a full day.
No, the tank must be drained and flushed with fresh water several times. Salt and microbes attack the weld and cause rapid corrosion after repair. Thorough rinsing ensures clean, long-lasting welding.
