Fill valve
Adjusted or replaced when filling is slow, noisy or never stops.

Ahmadi
Cistern repair at Zour power station requires understanding high-pressure systems. We test the fill valve, pan seals and supply pipes under full station pressure. We fit new parts and confirm pressure stability after repair.
Zour power station bathrooms connect to high-pressure heated water networks, so any seal weakness causes immediate visible drips. Cisterns are bolted to steel floors with calibrated anchors and pipes are welded to code. We bring all repair parts from stock and never use locally sourced items, and we run three full flush cycles in front of the station engineer.
Zour sits in Ahmadi governorate, a power generation plant area where heated water at high pressure runs continuously.
Before leaving, the cistern cycles three times while we watch the station pressure gauge to confirm it does not drop.
Adjusted or replaced when filling is slow, noisy or never stops.
Repaired when water trickles constantly from cistern to pan.
Set or replaced to restore the correct water level inside.
Checked and reseated when the joint leaks at floor level.
Broken or loose seats replaced on the same visit.
Wax or rubber seal replaced when water pools at the base.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, heat makes rubber brittle within weeks. We install seals rated to 80 degrees Celsius and test them with hot water from the line before handover.
Yes, because high pressure will force water from the cistern while we disassemble. We collect the valve key from the station engineer ourselves and log the time in the station record.
