New pipe runs
Cold and hot supply lines routed to fixtures and tanks.

Mubarak Al-Kabeer
Water pipe runs in Abu Fatira start by assessing distance from the main pumping station to villas scattered across the residential area. We route distribution lines under streets and roads, burying them deep enough to protect pipes from ground pressure and heat. We test the entire network under high pressure before handover.
Abu Fatira villas spread across a wide area needing long runs of mains pipe under paved roads. We dig trenches at uniform depth and lay pipes graded in one direction to clear air and settled water. We mark the main run route with plastic flags on the surface to prevent random digging later.
Abu Fatira sits in Mubarak Al-Kabeer governorate, a sprawling residential zone relying on precise water distribution piping under main roads.
Every hundred metres of main pipe is checked for leaks with a listening device after the line is filled.
Cold and hot supply lines routed to fixtures and tanks.
Leak located acoustically and by camera before any breaking.
Wrapping exposed or roof-level pipes against heat and condensation.
Removing mineral scale that narrows the pipe wall over time.
Targeted clearance of blocked supply lines without unnecessary breaking.
Internal camera pass and pressure check before pipes are concealed.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We bury pipes at least one metre deep to avoid traffic loads and heavy vehicles. We backfill the trench with mixed sand and small stones before repaving.
We pinpoint the burst with a sonic detector, cut the asphalt directly above it and extract the damaged section. We join the sound ends with a metal slip coupling locked very tight, refill the trench and repave.
