New pipe runs
Cold and hot supply lines routed to fixtures and tanks.

Mubarak Al-Kabeer
Water pipe installation in Mubarak Al-Kabeer starts by checking old lines buried under foundations and walls. We run new copper or plastic pipes from the meter to every outlet with steady fall. Pressure and leak testing happens before walls and floors close up.
Mubarak Al-Kabeer homes are thirty years old or more, and most original pipework is old galvanised steel with slow leaks at joints and cracks. When a family wants a new supply to an extra bathroom or expanded kitchen, we trace from the meter without breaking the old construction if possible. We choose pipe diameter based on the original line size and local pressure.
Mubarak Al-Kabeer sits south of Kuwait City near Messila Beach, an older residential area where most houses have a single water supply line entering from the street.
Every new water line is pressure-tested for thirty minutes to detect any leaks at the joints.
Cold and hot supply lines routed to fixtures and tanks.
Leak located acoustically and by camera before any breaking.
Wrapping exposed or roof-level pipes against heat and condensation.
Removing mineral scale that narrows the pipe wall over time.
Targeted clearance of blocked supply lines without unnecessary breaking.
Internal camera pass and pressure check before pipes are concealed.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
If there is space between the foundation and tiles, we run the pipe underneath gently using a push rod. If the floor is bonded tightly, we cut only a narrow channel along the required route, then reset matching tiles.
Weak pressure often comes from a pipe diameter too small for the long run or partial blockage at the joints. We test pressure at the meter source and inspect each joint with a fine strainer to clear any debris.
