New pipe runs
Cold and hot supply lines routed to fixtures and tanks.

Jahra
In Jahra Industrial, multiple factories need a central water network with steady pressure. We build a single main distribution system feeding separate branches to each factory with independent meters. We study hourly demand and seasonal peaks and size pipes and tanks accordingly.
Jahra Industrial houses cement, petrochemical and desalination plants, each with different water demands. Chemical factories need high-purity supply, so we fit multi-media strainers before the main line. Rooftop storage tanks must be thermally insulated because extreme seasonal swings drop pressure at peak demand. We avoid clamping pipes directly on hot concrete in summer and use spaced metal supports for thermal expansion.
Jahra Industrial sits north in Jahra governorate, a major cluster of heavy and medium manufacturing plants.
We monitor main line pressure and flow with data loggers for a full month before handing over the network.
Cold and hot supply lines routed to fixtures and tanks.
Leak located acoustically and by camera before any breaking.
Wrapping exposed or roof-level pipes against heat and condensation.
Removing mineral scale that narrows the pipe wall over time.
Targeted clearance of blocked supply lines without unnecessary breaking.
Internal camera pass and pressure check before pipes are concealed.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if we don't fit check valves on each factory branch. We place a check valve on every feeder line and install a small private tank for each factory to buffer it from main line breaks.
We insulate runs with white polyurethane foam reflecting sunlight and coat them with reflective paint. We leave at least 5 cm clearance between pipe and supports to allow movement, and inspect joints each season for over-tightening.
