New pipe runs
Cold and hot supply lines routed to fixtures and tanks.

Jahra
Water pipe runs in Qaisariya suit a mix of residential houses and small farms scattered across the area. We lay pipes from individual or shared tanks through walls and foundations, accounting for sandy ground and high heat. We pressure-test each joint and document routes before covering with plaster or backfill.
Qaisariya houses and small fields need design flexibility because some buildings are old and others new, and we often find multiple roof tanks needing unified distribution lines. We remove damaged or unsuitable pipes and lay copper or polyethylene based on use, installing check valves to prevent backflow between tanks. We test pressure and flow from each tap and confirm steady fall on long horizontal runs to prevent sediment settling.
Qaisariya sits in Jahra governorate and holds a mix of small residential houses and limited farming plots.
Every new network is tested at 6 bar for one full hour with a written log of pressure gauge readings every five minutes.
Cold and hot supply lines routed to fixtures and tanks.
Leak located acoustically and by camera before any breaking.
Wrapping exposed or roof-level pipes against heat and condensation.
Removing mineral scale that narrows the pipe wall over time.
Targeted clearance of blocked supply lines without unnecessary breaking.
Internal camera pass and pressure check before pipes are concealed.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We fit a check valve on each tank outlet to prevent water mixing and backflow. Then we combine the lines into a single manifold after the valve and feed the main distribution network at steady pressure.
Yes, well water carries more minerals and sediment deposits slowly in long horizontal pipes. We use mesh filters at tank outlet, pitch pipes with strong fall, and disassemble pipes every two years to flush sediment.
