Roof-tank pump
Transfers water from ground tank to roof tank reliably.

Jahra
Water pump installation in Qaisariya serves homes and small fields in this mixed residential and farm zone. We measure wells and fit appropriate submersible pumps with balance tanks on roofs. We pressure-test all discharge pipes and check motors before handover.
Qaisariya mixes residential homes with small plots for animal and plant keepers. Each house has a well or shares one with neighbours, and wells here are medium-deep but need reliable pumps. We inspect old pipes inside before fitting because sediment and rust cut flow. The roof tank must match the house's daily needs, and we often add a level sensor to tell residents when it is full.
Qaisariya in Jahra governorate is a mixed zone of residents and smallholder farmers blending homes and plots.
Every new pump installation runs for two straight hours at full flow before the house goes back to normal use.
Transfers water from ground tank to roof tank reliably.
Keeps hot water at the tap without a long wait.
Sets correct cut-in and cut-out points, stops short-cycling.
Evacuates cesspits efficiently with a non-return valve fitted.
Lifts sewage from low-level units to the drainage network.
Protects basements from water accumulation via float-activated switch.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We measure the well diameter first, submersible pumps need at least 2cm clearance on each side. If it is too narrow we pick a slim pump made for tight wells.
Most Qaisariya homes have single-phase supply which is fine for standard well pumps up to 2 horsepower. Only large pumps need three-phase, rare in residential homes.
