New pipe runs
Cold and hot supply lines routed to fixtures and tanks.

Farwaniya
Water pipes in Rai Industrial Area serve warehouses, workshops and large shops requiring high and steady flows. We design a system with thick copper pipes from the main meter, install shutoff valves and meters at strategic points to monitor consumption and pressure.
Industrial buildings in Rai are built on deep concrete floors and strong foundations, allowing large pipes to be laid underground without worry about settlement or cracking. We dig trenches at uniform depth and support pipes on metal brackets before pouring a concrete protective layer. We pressure test pipes before covering because fixing an underground leak requires extensive excavation and long work stoppage.
Rai Industrial Area lies in Farwaniya governorate and is adjacent to The Avenues, a major commercial development.
We test pipes under pressure double the expected operating pressure for a full hour with no drop.
Cold and hot supply lines routed to fixtures and tanks.
Leak located acoustically and by camera before any breaking.
Wrapping exposed or roof-level pipes against heat and condensation.
Removing mineral scale that narrows the pipe wall over time.
Targeted clearance of blocked supply lines without unnecessary breaking.
Internal camera pass and pressure check before pipes are concealed.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
It depends on simultaneous use points and the type of work. A machine shop needs at least 50mm, and we calculate branch diameter from the main based on distance and available pressure.
Yes, using special T-joint fittings that allow connection without stopping flow. We install an isolation valve on the new line first, then connect it to the main system while water continues in other lines.