New pipe runs
Cold and hot supply lines routed to fixtures and tanks.

Capital
Water pipes in Shuwaikh Industrial serve large factories and production lines needing steady pressure and high flow without interruption. We install a distribution network with separate branches to each plant, individual meters and fast-closing emergency shutoff valves.
Factories and logistics warehouses in the industrial zone need very large-bore pipes, and hot and cold lines run alongside each other. We use thermal insulation fittings because cold pipes near steam condense humidity and rust rapidly. Each branch to a separate plant needs a collection point before entry for easy inspection and maintenance, and we fit heavy filters because industrial dust enters with the water.
Shuwaikh Industrial sits in Kuwait City and houses thousands of factories, warehouses and logistics stations.
Every added pipe section in the industrial zone is pressure-tested at 6 bar for a full hour because of continuous heavy load.
Cold and hot supply lines routed to fixtures and tanks.
Leak located acoustically and by camera before any breaking.
Wrapping exposed or roof-level pipes against heat and condensation.
Removing mineral scale that narrows the pipe wall over time.
Targeted clearance of blocked supply lines without unnecessary breaking.
Internal camera pass and pressure check before pipes are concealed.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We wrap pipes with thick foam or rubber insulation at least 2 centimetres thick to stop warm air contact. Then we lift them slightly and pitch them toward a floor drain so water droplets do not stand.
Yes, industrial 100-micron filters need changing every two to three months depending on dust density. We check them weekly by reading the pressure drop on the gauge, and if it rises the filter is clogged and needs immediate replacement.