Roof-tank pump
Transfers water from ground tank to roof tank reliably.

Capital
Water pump installation in Shuwaikh Industrial serves factories and processing systems that need steady pressure around the clock. We assess actual flow demands from the line and fit a pump and motor with enough power for continuous operation without interruption.
Shuwaikh Industrial factories have large yard tanks and long distribution lines feeding production sections, all needing a powerful pump and regular checks. We test flow from each branch and measure pressure at distant points to ensure all sections get equal supply strength. We fit a digital pressure gauge on the main line and leave the factory a yearly maintenance schedule including tank sediment cleaning.
Shuwaikh Industrial sits in Kuwait governorate as a manufacturing and logistics zone where large facilities depend on steady water pressure.
The intake valve from the tank is inspected every six months because sand and debris clog the strainer and cut pump intake flow.
Transfers water from ground tank to roof tank reliably.
Keeps hot water at the tap without a long wait.
Sets correct cut-in and cut-out points, stops short-cycling.
Evacuates cesspits efficiently with a non-return valve fitted.
Lifts sewage from low-level units to the drainage network.
Protects basements from water accumulation via float-activated switch.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
If the gauge reads above 4.5 bar the pump is overloaded and the line may be blocked. We flush the pipes and check the pressure control valve, and may need an extra distribution line if demand has grown.
Yes if the pump is properly sized and placed close to the main tank. If the distance exceeds one hundred metres we may fit a second pump at the line end to boost pressure at distant sections.
