Pit inspection
Pit dimensions and condition checked before any pump is selected

Farwaniya
Installing a sump pump in Firdous starts by locating the pit beneath the house floor near Sixth Ring Road. We measure water accumulation and the floor slope, then select pump discharge capacity accordingly. We run the outlet line toward the street or shared cesspit and test it at full capacity before finishing.
Firdous houses are relatively new with simple concrete floors, but their proximity to Sixth Ring Road and seasonal groundwater rise make water accumulation a common issue. Most houses sit above old drainage pits or very shallow floor traps that cannot absorb water fast enough. We check trap depth and the main drain line fall before installing the pump, and if the floor is too low we raise the pump suction point slightly.
Firdous sits in Farwaniya governorate near Firdous Co-op, a modern residential area at low elevation relative to natural ground.
After installation we run the pump for at least ten minutes to confirm motor stability and steady discharge.
Pit dimensions and condition checked before any pump is selected
Capacity matched to actual water ingress rate, not a generic size
Switch level set and float travel confirmed free inside the pit
Discharge direction verified and non-return valve fitted to stop backflow
Earthing and moisture-rated socket confirmed before the pump is powered
Pit filled manually and full run cycle confirmed before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes if there is adequate fall toward the outside and the pipe is large enough to resist blockage. We prefer rigid pipe rather than flexible beneath the floor, and test flow carefully because any underground clog is hard to fix.
The pit must be deep enough to hold water for hours before the pump triggers, but not so deep it weakens the house foundation. We measure column and beam locations before digging and typically choose a pit about one metre wide and one and a half metres deep.
