Pit inspection
Pit dimensions and condition checked before any pump is selected

Ahmadi
Dry basement sump pump installation in Sabahiya requires careful inspection of the collection pit below floor level. We measure its dimensions and check its walls, then select a suitable pump and position the float to start pumping when water rises.
Older residential houses in Sabahiya typically have basements dug into damp clay soil with slow seepage marks on the walls. The pit needs clearing of silt before we install the pump, and we level the pit floor to be solid and even. We run the discharge line to a floor trap or outside the property, and operate the line under full pump pressure for ten minutes to ensure there is no blockage.
Sabahiya is a residential area in Ahmadi governorate where older family houses commonly suffer from basement dampness.
Before handover we fill the pit with water and run the pump to verify the float automatically shuts it off as water level drops.
Pit dimensions and condition checked before any pump is selected
Capacity matched to actual water ingress rate, not a generic size
Switch level set and float travel confirmed free inside the pit
Discharge direction verified and non-return valve fitted to stop backflow
Earthing and moisture-rated socket confirmed before the pump is powered
Pit filled manually and full run cycle confirmed before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We fully clean the pit before installation and clear fine silt. We fit a mesh strainer inside the pit around the pump intake to catch coarse particles, and inspect it every two months.
Yes, we need a safe power outlet near the pit. We fit a control panel beside the pump and run its wire to the main distribution board in the house.
