Pit inspection
Pit dimensions and condition checked before any pump is selected

Capital
A basement sump pump in Shuwaikh Industrial must handle both pipe leaks and heavy rainfall pooling under workshops and storage areas. We measure pit volume, select an oversized pump, fit a dual float for on and off, and test everything under full pressure.
Factories and large warehouses in Shuwaikh Industrial have wide concrete floors with complex underground water and waste pipes, often with a central collection pit at the lowest point. We check pit walls for old cracks leaking groundwater, clear the pit of silt before fitting, and install separate floats that start the pump at the first rise and stop it as water drops. The discharge runs above floor level or slopes toward an external drain trap well clear of load-bearing foundations.
Shuwaikh Industrial is a factory-dense zone in Kuwait governorate where seasonal water threatens operations and stock.
We test the pump running against full discharge pressure because long lines reduce output.
Pit dimensions and condition checked before any pump is selected
Capacity matched to actual water ingress rate, not a generic size
Switch level set and float travel confirmed free inside the pit
Discharge direction verified and non-return valve fitted to stop backflow
Earthing and moisture-rated socket confirmed before the pump is powered
Pit filled manually and full run cycle confirmed before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
If the existing pit is too shallow or blocked we break the floor, widen the pit and deepen the bottom to hold the pump and floats. We repour concrete around the new pit walls.
Yes, but the roof line must be separate and straight before entering the pit. We measure the combined flow from roof and floor together before sizing the final pump power.
