Tank and line check
Tank size and pipe run checked before any pump is chosen

Mubarak Al-Kabeer
Installing a roof tank pump in Masayel begins by running the supply line from the ground floor to the upper tank. We check the existing water pressure and select a pump sized for the building height and pipe length. We fit the pump, isolation valves and check valve, then test steady flow before handover.
Masayel houses are mid-rise, usually three or four storeys, with tanks on the roof and no separate pump room. We look for space beside the tank or on the nearby wall to mount the pump, and measure from the ground floor trap to the tank inlet. If the old copper pipes are narrow or leaking we recommend running a new supply line direct from the main trap to avoid water starvation to the tank.
Masayel is a residential district in Mubarak Al-Kabeer governorate, where roof tanks are the main source of steady water supply in family homes.
The pump runs under full load for five minutes to verify the motor does not overheat before we leave the site.
Tank size and pipe run checked before any pump is chosen
Type and capacity matched to actual tank height and demand
Pump seated on isolation pads to stop vibration reaching the structure
Inlet and discharge lines fitted with non-return and isolation valves
Outlet pressure measured and confirmed stable under normal fixture load
All joints inspected for leaks before the job is signed off
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
It depends on pump power and pipe size. In three or four-storey Masayel homes, a mid-range pump fills the roof tank from the ground floor in one or two hours. We test it after fitting to confirm water reaches the top at steady speed.
Yes, daily pump operation requires checking the check valve and isolation valve every six months. If water pressure drops or the pump stops spinning, we inspect the line for blockages or leaks in the pipe runs.
