Tank and line check
Tank size and pipe run checked before any pump is chosen

Capital
Roof tank pumping in Salhiya lifts water from the central supply line to a metal or concrete tank on a commercial building roof. We measure the rising pipe length and static head, choose a pump with enough power to ensure steady flow during business hours, fit it and set it to the correct pressure.
Commercial complexes, hotels and offices in Salhiya are built at varying heights, many rising more than thirty metres above street level. Their tanks are large and need a high-head pump able to resist the back-pressure of water stacked in the rising main. We inspect the existing pipe from bottom to roof, dismantle any weak joints and rebuild them safely, and if the pipe is corroded we recommend full replacement.
Salhiya is a major commercial zone in Kuwait City where the Sheraton Hotel and large business complexes stand, and water must be lifted forcefully to very high roofs.
Every pump is tested at full load for two continuous hours because large commercial buildings cannot tolerate flow interruption.
Tank size and pipe run checked before any pump is chosen
Type and capacity matched to actual tank height and demand
Pump seated on isolation pads to stop vibration reaching the structure
Inlet and discharge lines fitted with non-return and isolation valves
Outlet pressure measured and confirmed stable under normal fixture load
All joints inspected for leaks before the job is signed off
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
A centrifugal pump gives high flow at moderate pressure and suits large tanks with long pipes. A gear pump gives high pressure at low flow and suits narrow lines and tall buildings.
Yes, we fit a non-return valve right after the pump to stop water from siphoning back when the pump stops. And if the line is very long we add an air valve at the highest point in the pipe.
