Roof-tank pump
Transfers water from ground tank to roof tank reliably.

Capital
Installing a booster pump in Salhiya means calculating the pressure needed to deliver water to the top of the commercial complex and hotel towers. We size the distribution line diameter, select a suitable horsepower motor pump, then run a field pressure test before handover.
The dense commercial area around the Sheraton and complex hotel needs long distribution lines with stepped lift to push water across multiple storeys. We install a pressure gauge at the pump outlet to track daily performance, and test the safety valve on the line to ensure it opens when pressure exceeds the limit. Where the line runs across hot roof areas we insulate it to prevent pressure loss and temperature swings.
Salhiya in Kuwait governorate houses a large commercial complex and famous hotel, an area with very high water demand and load.
Before handover, we record the pump static pressure with no flow to confirm motor and valve settings are correct.
Transfers water from ground tank to roof tank reliably.
Keeps hot water at the tap without a long wait.
Sets correct cut-in and cut-out points, stops short-cycling.
Evacuates cesspits efficiently with a non-return valve fitted.
Lifts sewage from low-level units to the drainage network.
Protects basements from water accumulation via float-activated switch.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We insulate distribution lines with foam or mineral wool to reduce pressure loss from thermal expansion and friction. Insulation keeps pressure stable throughout the day, especially during peak heat hours.
The safety valve on the line opens automatically to release excess pressure back to the storage tank. This protects the pipework and fittings from burst and sudden leak.
