Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Capital
Tank installation in Salhiya begins by calculating roof load and routing supply lines from tank to building network. We size the tank correctly, secure it on steel bases, run feed and overflow pipes with isolation valves at each critical point.
Salhiya commercial buildings have restricted roof areas and deep foundations, so most clients choose medium-sized rooftop tanks rather than massive ones. Near Salhiya Commercial Complex we mount tanks on raised steel frames to ensure stable pressure in upper floors. We check ceiling strength before fixing and run water through all joints for an hour to confirm no leaks.
Salhiya sits in Kuwait governorate, a commercial district where shops and offices need reliable water supply throughout the day.
Water pressure is measured on every floor after installation because different levels must have equal pressure.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
It depends on occupant numbers and daily use. We calculate the load first, then select tank size; we usually recommend a medium tank with a booster pump for upper floors.
We install the tank on a separate steel frame that rests on load-bearing walls or columns. This spreads the weight instead of concentrating it on one ceiling.
