Line camera check
Camera films the drain before work begins to rule out blockage or fracture

Jahra
Sewage pumps in Salmi serve homes and facilities near the border zone, operating in extremely harsh climate. We pick a pump built for intense heat and sandstorms and test it under prolonged load.
Salmi is a remote border zone where facilities are scattered and the main network is close by, but weather is brutally harsh. Summer temperatures reach 55 degrees Celsius and northern winds carry thick sand. Standard pumps fail quickly in these conditions, so we pick a type with a protected motor and sand-resistant seals. We fit a protective cover over the tank and clean ventilation inlets regularly. Copper and iron pipes rust and leak fast, so we choose high-density plastic pipes instead.
Salmi is a border area in Jahra governorate near the Kuwait-Iraq border where climate is extremely severe.
Before handover we test the pump at full load while tank temperature exceeds 50 degrees Celsius to ensure it will not stall in harsh summer.
Camera films the drain before work begins to rule out blockage or fracture
Capacity matched to the sewage load and the discharge pipe length
Pump installed with a non-return valve and fully sealed pipe connections
Moisture-rated cable routed clear of standing effluent and secured properly
Operating level set to prevent overflow and protect the pump from dry running
Pump run under real flow before handover to confirm correct discharge
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
High-density plastic pipes steadily withstand up to 60 degrees Celsius. We choose UV-resistant types to avoid brittleness from sun. Once yearly we inspect exposed pipes and coat them with protective paint if needed.
At least every two months we open the tank and flush out sand and debris. The motor needs air filter cleaning every two weeks. If you skip maintenance, the motor will fail in under six months.
