Line camera check
Camera films the drain before work begins to rule out blockage or fracture

Capital
Sewage pump installation in Sawaber begins with thorough inspection of drainage systems in residential towers and multi-storey properties. We measure rising main length, required pressure and basement depth, select a pump with adequate capacity and conduct a full-load operation test.
Sawaber complex comprises closely spaced residential towers and dense housing properties in the city centre, each with its own sewage pit or shared collection. Loads from hundreds of residents require powerful pumps capable of lifting water over twenty metres high. We inspect rising main quality and electrical isolation of the pump and test it at maximum capacity for three minutes.
Sawaber lies in Kuwait City as a central residential complex, a high-density zone where towers and modern buildings depend on reliable pumping systems.
The control panel is tested through ten consecutive pump cycles to confirm float stability and electrical relay function.
Camera films the drain before work begins to rule out blockage or fracture
Capacity matched to the sewage load and the discharge pipe length
Pump installed with a non-return valve and fully sealed pipe connections
Moisture-rated cable routed clear of standing effluent and secured properly
Operating level set to prevent overflow and protect the pump from dry running
Pump run under real flow before handover to confirm correct discharge
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We calculate total flow from all towers during peak hour; if load is high we install two or three pumps in duty rotation or parallel duty. We test each pump alongside others under full pressure.
Parallel duty reduces load on each pump and extends its service life. We install a failsafe system so if one pump fails the other takes full responsibility without delay.
