Water tank installation in Hadiya starts by examining roof condition, structural frame and foundation capacity. We determine tank size based on occupancy and daily use, then run supply and waste pipes with proper sizing. Pressure and flow are tested on every floor before the pump is finally switched off.
Hadiya is an area of relatively modern houses with strong roofs, regular lot sizes and organized public drainage. The local sandy soil is firm and permits basement tank excavation more easily than other areas. We test soil before fixing the steel frame and confirm no other power or water lines run beneath the surface.
Hadiya sits near Ahmadi Town in central Ahmadi governorate and is known for regular planning and good infrastructure services.
The tank is filled completely and pressure is measured at the farthest consumption point for one hour.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No if the excavation is kept at safe distance from the foundation, typically at least one meter from the outer wall. We test soil first with a small trial pit and confirm no existing cracks run along the foundation.
If the tank is sealed tight, water stays potable for many weeks. But we recommend draining and cleaning once yearly and emptying if you notice any smell or cloudiness.