Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Farwaniya
Water tank installation in Hassawi begins with calculating household consumption and choosing between a roof tank or an underground tank beneath the structure. We measure dimensions and distances, select the mounting location, set the tank, connect inlet, outlet and overflow lines, then test pump and fill before handover.
Hassawi houses are older in character and roofs vary, some with flat reinforced concrete and others sloped or light-duty. Before setting any roof tank we inspect the structure inside to ensure it bears the full weight of the tank and water together. If the roof is weak we choose an underground tank instead, dig in the yard or garage and set the tank on a solid concrete base.
Hassawi is in Farwaniya governorate, an older residential district where most houses rest on shallow foundations and simple roof structures.
When connecting an underground tank we test all joints under water pressure for at least one hour before backfilling.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Only after careful inspection of the structure, load-bearing beams and joints. If we find weakness we recommend an underground tank instead, because a collapse threatens the occupants.
A roof tank usually takes two days, while an underground tank needs digging, concrete and drying which may take three days. Testing and pumping wait until the base is fully cured.