Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Ahmadi
Tank installation at Mina Abdullah requires attention to salt air and vibrations from cargo operations. We select corrosion-resistant tanks with strong bracing against wind and movement. Supply from the central desalination plant connects via insulated piping with regular check valves.
Port installations and warehouses need fresh water tanks away from salt spray. A roof tank provides good pressure for offices and workshops, but dock-side areas need extra protection from moisture and salt. We check pipe thickness and joint quality carefully because corrosion starts fast in this environment.
Mina Abdullah sits in Ahmadi governorate, Kuwait's main oil export terminal where continuous operations demand reliable water supply.
Corrosion resistance is checked on pipes and joints every six months in this coastal zone.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we use epoxy-coated or heavy-galvanized pipe. Protective coating extends pipe life from two years to ten in salt environments.
We locate the leak using pressure testing and isolate the damaged section, then replace the pipe or joint. For minor leaks, we apply temporary sealant tape while ordering a replacement part.
