Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Hawalli
Water tank installation in Mubarak Al-Abdullah often happens during or right after construction work finishes in this newly built Hawalli suburb. Technicians clear leftover construction debris from the tank chamber and its pipes before first use to ensure clean water from day one.
New Mubarak Al-Abdullah villas sometimes have their tanks fitted before all construction debris is cleared from the site, so levelling sand, cement dust or small insulation offcuts can find their way into the tank chamber or feed pipes before final sealing. We flush the tank chamber thoroughly before first fill, check the inlet filter to confirm it is not clogged with construction dust, and test initial water quality after installation before handing the villa to the family to confirm it is fully clean.
Mubarak Al-Abdullah in Hawalli is a newly built villa community with new streets, where tanks are usually fitted during or right after construction finishes.
Flushing a new Mubarak Al-Abdullah tank chamber before first fill removes construction dust and levelling sand trapped since installation.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We flush the tank and test the water first before handover, since minor construction debris can find its way into the chamber or pipes before final sealing.
Construction dust or levelling sand can sometimes find its way into the tank chamber or pipes before final sealing, and cleaning the filter and flushing the tank usually solves it.
