Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Capital
Water tank installation in Qibla starts by inspecting roofs and ground spaces to choose the right size and location. We hoist the tank by crane onto a level concrete base and run supply and pump lines from the meter. We test pressure and flow before handover.
Most residential buildings in Qibla are four or five storeys and need a roof tank to distribute water steadily across all floors. The roofs here are usually flat and strong, but we verify their load capacity when full before fixing. We run rising mains from the ground pump and connect drop lines to each storey with pressure-balance valves fitted at the upper outlets.
Qibla sits in central Kuwait City where commercial and residential buildings stand close, requiring careful calculation of tank size and pump location.
Every supply line is flushed with running water for ten minutes because new pipes may hold factory debris and dust.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We first inspect the slab thickness and columns with precise measurements and engineer calculations. If the roof cannot bear the weight, we instead choose an underground or ground-level tank beside the building.
Installing the tank, pipes and pump usually takes one or two days depending on tank size and pipe complexity. We test everything before leaving to ensure there are no leaks anywhere.
