العربية Call now

Farwaniya

Roof tank installation in Abraq Khitan

Roof tank installation in Abraq Khitan starts by checking the roof structure's load capacity and the space between the stairwell and edges. We choose a position that lets the main feed pipe rise from below, level the tank exactly, connect supply and waste lines, then test pressure before handover.

  • 24-hour emergency
  • Camera first, every job
  • Leak detection without breaking
  • All six governorates

What sets this area apart

Most Abraq Khitan houses are three or four storeys with flat roofs and low iron railings. The space between the stairwell wall and the railing is tight, so we pick a tank diameter that fits the available passage. We map the distribution route from the tank to the second-floor distribution points, because vertical pipes will run inside the soil stack if one exists or along the outer wall. We check for electrical or air vents on the roof before drilling any holes.

Abraq Khitan lies in Farwaniya governorate, a built-up residential district of multi-storey apartment blocks that rely on roof tanks for water distribution.

Every joint is tested separately with a stand-alone gauge before full system pressure is applied to catch leaks in new pipework.

What the installation covers

Tank installation

Mounting the tank on a level concrete base to protect its base from cracking

Inlet and supply lines

Running the fill line and distribution line to floors in PPR pipe

Overflow and drain line

Installing the overflow at correct slope so no water pools on the roof

Pump connection

Connecting the existing transfer or pressure pump and setting its switch

Float valve fitting

Fitting a brass float valve sized to the tank for accurate fill cut-off

Pressure test

Testing all joints under pressure before handover to confirm no leaks

How we work

Our four steps, and you see every one

Illustration of a phone with a speech bubble showing a drain grate
01

You call and describe it

Tell us what is happening and where, and the right equipment is loaded before we arrive.

Illustration of a drain camera reel and monitor at a floor drain
02

The camera goes down

We film the line from inside and know the kind of blockage and its exact place. No guessing.

Illustration of a jetting nozzle spraying into a drain opening
03

We clear it

High pressure water, a machine or a drain snake, whichever the line actually needs.

Illustration of a monitor on a tripod showing a clear line with a tick
04

We film it again

The camera runs a second pass and you see the line clear with your own eyes before we leave.

Who we work for

Same method, same equipment. Only the size of the job changes.

A clean modern bathroom with grey stone tiling

Homes and apartments

  • Drain and gully unclogging
  • Cesspit suction
  • Leak detection without breaking
  • Tank cleaning and waterproofing
A modern office washroom with wall hung basins

Offices

  • Plumbing maintenance contracts
  • Mixer and valve repair
  • Low water pressure
  • Clearing bathroom lines
A stainless steel commercial kitchen with a floor channel drain

Restaurants

  • Grease traps
  • Commercial kitchen lines
  • Restaurant gas lines
  • Scheduled clearing and cleaning
A basement plant room with pumps and neat pipework

Complexes and buildings

  • Sewer network maintenance
  • Sewage and basement sump pumps
  • Manhole and inspection chamber cleaning
  • Operation and maintenance contracts

Why us

Why Al Amana

Amana means trust. Someone else's home is not ours to be careless in.

  • Filmed before and after

    Do not take our word for it. Look at the line yourself.

  • Clearing before breaking

    Breaking is the last resort, never the first step.

  • 24-hour emergency

    A blocked line does not wait for the morning.

  • All of Kuwait

    Six governorates, 139 areas.

  • Maintenance contracts

    For buildings and complexes, servicing before the problem starts.

  • We work on commercial sites too

    Restaurants, offices and complexes, not only homes.

More areas for Roof tank installation

Back to Roof tank installation

Other services in Abraq Khitan

Common questions

Questions about Roof tank installation in Abraq Khitan

Need someone now? The emergency line is open any hour.
+965 9668 4964

How long does moving a tank up the house stairs take?

A 500-litre tank needs three workers and ninety minutes to reach the roof from ground level. We remove the metal handrail temporarily if it blocks the passage, and angle the tank through the narrow corridor.

Must the roof tank sit higher than every tap in the house?

Yes, because water flows by gravity from the tank to every outlet. If there is an upper floor or high terrace, we place the tank on a concrete platform to ensure sufficient pressure at the highest point.

A quiet Kuwaiti residential street with a drain cover in the pavement

Need this now?

Tell us what is happening, and the right equipment is on the van before we set off.

Call now WhatsApp