Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Farwaniya
Roof tank installation in Ardhiya Industrial starts with checking the slab strength and existing steel frame. We position the tank away from vents and exhaust outlets, run supply and waste lines with proper ventilation pipe, then test pressure and leaks before handover.
Industrial buildings in Ardhiya have high flat roofs and heavy machinery load, with most surfaces divided by firebreak walls. We inspect the beams and columns to place the tank safely over them, avoiding compressed air and power lines. The supply often runs from an old underground tank or the main meter, and waste needs a steady fall toward a known drain point far from the materials store.
Ardhiya Industrial in Farwaniya is a busy zone of metal shops and assembly works where roofs are used to store stock and machinery.
Before handover the tank is filled and pressure monitored for a full hour because slow leaks at joints may not show in the first few minutes.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
That is the first thing we calculate for load and bearing. If the slab is weak we set the tank on steel brackets that rest on the main columns below.
We map all existing lines first, then place the tank well clear of them. If there is no space we lift the old lines or reroute them to a safe path.