Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Mubarak Al-Kabeer
Roof tank installation in Abu Fatira requires careful checking of older roof structures that are sometimes weak. We measure concrete thickness and choose a base that distributes the load evenly. Cold water, hot water and waste pipes are laid in the correct sequence and tested under full pressure.
Abu Fatira houses are relatively old and roofs were not originally designed to carry a water-filled tank. Existing cracks and settlement must be checked before placement, and if we find weakness we fit extra supports or suggest reinforcement. We also check the stairwell and opening positions because the tank must not block access or threaten existing structures.
Abu Fatira sits in Mubarak Al-Kabeer governorate and is an older residential area with established housing stock.
We measure roof height and existing load before installation because older structures may need concrete reinforcement.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but with extra steel supports that transfer the load to the bearing walls below. We assess the structure first by a specialist if any doubt exists.
Yes, we shut the main supply before cutting old pipes and connecting the new tank. Drainage is directed into nearby gullies or vacant ground.
