Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Mubarak Al-Kabeer
Roof tank installation in Qosor usually goes on homes built at different ground levels. We select tank size by foundation depth and distance from the main riser, run pipes on a proper fall. The main outlet connects to the sewer line and full pressure is tested end to end.
Qosor is hilly and homes sit on raised foundations, meaning longer supply runs from the main riser and good natural drainage fall. We check the height of the rising main and cold water inlet point because thermal expansion in long pipes needs expansion loops. The tank itself is positioned away from roof edges to avoid strong downwind pressure in the elevated area, and we listen carefully for air noise in the supply line.
Qosor lies south in Mubarak Al-Kabeer governorate, where elevated terrain affects supply and waste line design.
We open all house taps together to test pressure and flow before sealing the tank.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Hot and cold water cause daily pipe expansion and contraction. Expansion loops allow pipes to move without rupturing or stressing joints and causing leaks.
We fill the tank and watch the level for two hours with no water draw. If it drops there is a leak in the tank or joints. We inspect all visible metal seams and tank seats for moisture.
