Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Jahra
Roof tank installation in Amghara must withstand strong winds and harsh heat due to proximity to the industrial zone. We choose a sheltered position using existing walls or structures. We fix the tank with reinforced mounting and test pipes under elevated pressure.
Homes in Amghara near the industrial zone face strong winds and airborne dust, so we focus on securing the tank firmly against side movement. We inspect drain pipes for sediment and dirt from industrial air. We install filters on inlet pipes and test water quality before handover.
Amghara is near the industrial zone in Jahra governorate, a residential area facing harsh climate conditions and constant wind exposure.
All bolts and fixings are tightened with a torque wrench to prevent loosening under repeated wind movement.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use heavy-duty metal fixing that ties the tank to the foundation or main building columns. We test stability by lifting with a jack then pushing the body to simulate wind force.
We fit a mesh cover on the vent opening to block large particles and install a filter on the main inlet line. We inspect the tank interior before first fill and clean it if needed.
