Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Ahmadi
Buildings near the Fahaheel market often have restaurants and cafes below flats, and roof tank installation in Fahaheel has to keep up with their busy hours. We size the inlet and float valve so the tank refills between the lunch and dinner rush instead of slowly running down all day.
A small ball float valve on a Fahaheel building tank may be adequate for flats alone, but add a restaurant kitchen and a cafe washing cups all afternoon and the tank drains faster than it refills. We check the incoming main pressure at roof level, fit a full-bore float valve or an equilibrium valve that opens wider under the same pressure, and where demand is split, give the commercial units their own tank so their peaks do not empty the residents' supply.
Fahaheel, around its market and Al Kout Mall in Ahmadi governorate, has mixed buildings with food outlets beneath residential flats.
A tank refills only as fast as its float valve opens, however large the tank itself may be.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Where its demand is heavy, yes. A separate tank stops kitchen peaks draining the supply that the flats upstairs depend on.
Only partly. If the float valve refills slowly, a bigger tank just takes longer to empty. The inlet has to be sized as well as the storage.
