Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Ahmadi
Roof tank installation in Dabaiya starts by assessing concrete structure strength and ensuring no roof leaks before hoisting the tank. We firmly anchor the base, hoist the tank, connect supply and overflow and run the pressure system to test.
Dabaiya is a southern desert zone where most houses are one or two storeys with open design and flat concrete slabs. These roofs are usually exposed to harsh sun and wind, and may be shallow with inadequate drainage depth. We inspect roofs for cracks and warping before installation and choose a spot away from electrical pipes or air intake. Supply comes from a local pump or network, and overflow slopes to a surface trap or side drain with a shutoff valve for flood control.
Dabaiya is in the southern desert of Ahmadi governorate, a remote sparsely populated zone where each household depends on an independent roof tank.
We install a manual valve on the overflow line because seasonal strong winds carry sand into the overflow opening and block drainage.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, water can reach 55 degrees Celsius. We suggest reflective white paint or insulating plastic cladding on the tank. If consumption is low we may recommend a smaller tank with faster water turnover.
Yes, before filling the tank we rinse it inside with clean water three times. Then we run full flow for an hour to purge any debris from the lines before actual use.
