Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Ahmadi
Roof tank installation in Julaiaa starts with detailed inspection of the concrete slab condition and existing reinforcement. We hoist the tank with a crane, anchor it on a reinforced base if needed, run water and drain lines and measure pressure at fixtures.
Julaiaa is a simple desert zone with houses usually medium-sized with traditional design and flat concrete roofs. Foundations often rest on thick sand layers that may shift over decades, so we check slope and subsidence before fixing. Supply lines come from adjacent wells or the main network if available, and overflow must slope toward a roof corner where a side drain or ground outlet sits.
Julaiaa is in the southern part of Ahmadi governorate, a remote desert zone where roof tanks are the main water storage source.
We pressure-test a full tank for two hours in Julaiaa instead of one because sandy soil causes gradual base subsidence.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, the roof must be repaired first or the base strengthened with additional concrete posts. We measure subsidence severity and decide whether new foundations or limited reinforcement will suffice.
We raise the overflow outlet above the roof with an elbow against the wind, or relocate the lower drain to a wall-sheltered spot. If drift persists we use thick metal pipe that sand cannot easily cover.
