Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Ahmadi
Roof tank installation at Zour requires high safety standards because the power plant needs steady, stable-pressure water with no fluctuation. We check roof strength, place the tank away from electrical equipment, and test pressure under all conditions.
Power stations at Zour consume large volumes of water for cooling and steam control. Roof tanks feed distribution systems that serve sensitive equipment. We choose tank size to ensure water doesn't run out if the pump stops for minutes. Pipes from roof to ground must run separate from any electrical cables. We secure them with strong metal clamps and leave adequate clearance for inspection and maintenance.
Zour sits in Ahmadi governorate and hosts a major power generation plant that depends on constant water supply throughout the day.
Before handover, we run the tank and pipes at constant pressure for a full hour to catch any slow leaks before actual operation starts.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We size the tank to cover one to two hours of station consumption. We install a non-return valve at the inlet to prevent backflow. We test this valve by stopping the pump and measuring how long pressure holds steady.
Yes, we keep water pipes away from all electrical cables by safe clearance and install uncoated metal pipes for extra electrical grounding. If a small leak occurs, it cannot reach any nearby electrical wire.