Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Mubarak Al-Kabeer
An underground tank in Qosor sits on rocky scattered patches, so deep excavation and firm bearing at all points is essential. Reinforced concrete is poured and external sealing covers the entire surface. Water-testing ensures complete integrity before handover.
Qosor has natural stone and basalt bedrock close to the surface, so tank excavation often needs breaker or machine digging. We first survey the ground and place the tank away from big rocks where we can. If we must dig near rock, we pour a thick concrete base spread wider to let the tank settle firmly without any shift.
Qosor lies in southern Mubarak Al-Kabeer governorate, where basalt rock outcrops show at surface in several spots.
Before backfill, we check tank stability on the base by tapping the walls gently with a hammer to hear an even solid tone.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but we first smooth the rock with sand and cement to make an even base. Then we pour concrete at least 20 cm thick over that prepared surface.
We stop and assess the site and discuss options with the owner. Either we shift the tank location aside, break the rock with specialized equipment, or choose a shallower depth.
