Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Farwaniya
Roof tank installation in Rehab begins by hoisting the empty tank to the roof and securing it on a stable concrete base. We run supply pipes from the meter and waste to the sink, fill the tank and test every joint under pressure before handover.
Rehab homes are simple two or three-storey family houses with wide open roofs but no fixed railings. We choose a corner position to mount the tank on a raised base that sheds seasonal rain. Supply pipes run down alongside the outer wall and enter the house at the main water line, while waste flows to a nearby kitchen sink or bathroom. We inspect all hose connections and elbows before the roof opening is sealed.
Rehab sits in Farwaniya governorate, a residential zone where every house has an open roof and a government water well nearby.
We fill the tank from the street supply before testing because mains pressure is limited in this area.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
The far corner away from the roof door where winds do not strike it directly. We raise it on a concrete pad and route supply pipes away from the roof edge to prevent twisting and rust from moisture.
No, the waste connects to the nearest sink or bathroom through a pipe with steady fall. We test the slope before burying it under tiles to ensure water does not stall when shut.
