Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Farwaniya
A roof tank in Shadadiya is lifted via the external stairs and anchored on a concrete base away from the roof edge. We run cold and hot water pipes from below, connect waste to the wet well, fill and pressure-test.
Shadadiya is a rural area on Farwaniya's outer edge, with scattered old houses and very high roofs. The tank here sits well away from the roof edge because winds are strong, and its base has drainage holes for seasonal water. Supply lines run down the outside of the house in exposed pipes with protective covers, and waste goes to a deep wet well. We check the base tie-down several times before first pressurization.
Shadadiya lies on Farwaniya's outer fringe, an open area where winds blow hard and seasonal rain is rare.
We secure the tank with four-point metal strapping to the base because winds here reach high velocity.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, so we use UV-resistant PVC pipes and thermal sleeves in winter. We inspect runs regularly because expansion and contraction cause leaks.
We raise the tank base about half a metre above ground and fit a non-return valve on the waste line. This keeps flood water out of the tank and internal pipes.
