Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Jahra
Roof tank installation in Waha requires solid fixing to a steel or concrete frame because older houses here have thinner slabs. We calculate the full tank load and choose the position closest to a bearing wall. We connect the pipes and pressure-test them before use.
Waha has a mix of large and small houses, some built in different periods, meaning roofs vary in strength and height. We measure the distance from the tank to the farthest point in the internal distribution network to ensure adequate pressure reaches there. If the roof is low or pipe slope is weak we may suggest a smaller tank or add a booster pump.
Waha is in Jahra governorate and is marked by mixed building ages and roofs of varying capacity to carry heavy loads.
Pressure readings are recorded at each outlet branch to confirm balanced distribution across all floors.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We install a reinforced steel frame that ties the tank to the main bearing walls rather than relying on the slab alone. This transfers the load directly to the building's vertical columns.
Existing pipes usually work if they are clean and clear. We test current flow first, and if we must cut through it is only along an existing outer wall or internal column.
