Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Jahra
Roof tank installation in Naeem requires careful inspection of the older slab condition and assessment of available fall from tank position to lower pipes. We select a fixing frame suited to existing structure strength. We connect pipes and test them at pressure equal to or exceeding expected working pressure.
Most homes in Naeem are relatively older and need thorough roof inspection before tank position is set. We look for cracks or concrete weakness and test the surface with temporary weight. Pipe slope from the tank down to the internal distribution network must be continuous without flat sections to prevent air or sediment buildup.
Naeem is in Jahra governorate and contains a range of residential homes with older roofs that need special care.
The tank is filled to capacity and we wait one hour to detect any slow leaks at joints or walls.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We measure concrete thickness and reinforcement depth first. If readings fall below safe standards we suggest steel props or partial re-casting.
Yes, after initial fixing we raise the tank with a hydraulic jack and inspect the base and lower joints from all sides to ensure firm fitting.
